Inspection Schedule
1.Foundation inspection:
call before backfill after foam and drain tile with stone have been installed.
2. Meter pedestal inspection
3. Rough construction, electrical hvac and plumbing
4. Insulation:
vapor retarder has to installed on walls and ceilings. attic insulation will be inspected during final inspection on most projects.
5. Final inspection:
all electrical devises, plumbing fixtures, exterior siding, interior finishes except final flooring and handrails need to be installed.